Corporate annual general meeting
Conference Tenting for 1,200 Guests
Two linked marquees, raised flooring, carpeting and 1,200 dressed chairs delivered and set in 36 hours.
- Tent hire
- Chairs
- Flooring
BAFA Tents & EngineeringProjects
A cross-section of jobs from our floor: structural fabrication, precision machining, shutdown repairs and large-scale event tenting.

Featured project
Design support, CNC plasma profiling, fabrication and installation of a 240 m² entrance canopy.
Retail development, Nairobi
Case list
Corporate annual general meeting
Two linked marquees, raised flooring, carpeting and 1,200 dressed chairs delivered and set in 36 hours.
Food processing plant
Reverse-engineered stainless guards and access doors, laser-fit hinges, installed during a weekend shutdown.
Cement handling operator
Turned replacement shafts and bronze bushes from worn samples, delivered inside 72 hours.
Agricultural estate
Rolled and welded 30,000 litre steel tank with ladder, walkway and protective coating.
Regional logistics operator
Fabricated drop-side trailer bodies with press-formed panels and galvanised fittings.
From our workshop
Every image below was taken on our own floor or on site with our crews - no stock photography.












Proof
Feedback from completed fabrication, repair and event jobs.
“They reverse-engineered a conveyor guard from a bent original and installed it over one weekend shutdown. We restarted Monday morning on schedule.”
“Two marquees, raised flooring and 1,200 dressed chairs went up in 36 hours. The crew handled the venue's sloping ground without being asked twice.”
“We send drawings and get a costed answer the same day, with the material substitutions explained. That is why they keep the work.”
Tell us what you need made, machined, repaired or hired. You get a costed, realistic answer - not a brochure.